Instructions: Sytis TC-90™ Network Connection for Wind Turbines

Ryan Severe

Instructions: Sytis TC-90™ Network Connection for Wind Turbines

26th Feb 2025

In our last post, Ryan Severe, Senior Plant Engineer, detailed the longstanding challenges of safety and production and then successful application of the Sytis TC-90™ infrared camera system at Pudget Sound Energy wind farm. While this article discussed the over-all impact of transitioning to continuous thermal monitoring systems, it didn't dive into any technical details on how this system works. 

For those more technically inclined - here is a quick how-to for setting up the network connections between the Sytis TC-90™ and the available ethernet.

 

Step 1: At the base of the tower there is a Hirshmann switch (Fiber to Ethernet media converter).

Step 2: Install a 120V power outlet, which is fed from the breaker for the turbine outlets (This is only needed so that the existing outlet is still available for use).

 

picture1.jpg

Example of a 120V power outlet.
 

Step 3: Connect a powerline - network extender to the power outlet and to an ethernet port on the turbine fiber Hirshmann switch. 

 

picture2.jpg

Powerline to ethernet connection.
 
 

picture3.jpg

Screenshot of where to purchase appropriate powerline ethernet adapter.
 

Step 4: In the nacelle, connect the second Powerline–network extender to one of the power outlets and then into a POE injector.

 

picture4.jpg

Screenshot of where to purchase appropriate POE Injector Adapter.
 

Step 5: Connect POE injector to the TC-90™ 

 

Short and sweet - this configuration works for any wind turbine as long as it has a 120V circuit for power outlets. 

 

For more information about Sytis or our available complete solutions, call 888-447-0651 or email info@sytis.com.

Related Posts

Emerging. New Infrared Camera Tech Allows for Continuous Thermal Monitoring to Prevent Arc Flash

Sytis Project Manager, Troy Goss, contributed the following article to Factor This, an online, educational, global platform dedicated to…
View Details

Instructions: Sytis TC-90™ Network Connection for Wind Turbines

In our last post, Ryan Severe, Senior Plant Engineer, detailed the longstanding challenges of safety and production and then successful…
View Details

Success. Applying Continuous Infrared Camera Technology and Software at Pudget Sound Energy

Successfully Applying Recent Breakthroughs in Continuous Infrared Camera Technology and Software to Longstanding Challenges in Safety an…
View Details